Project Information

Project:QT4-15 Automatic Block Production Line — Mawa
Category:Machine Installation
Date:2025
Status:Completed

About the Project

Turnkey installation of a QT4-15 hydraulic block machine at a new factory in Savar. The project included civil foundation work, machine installation, hydraulic power unit commissioning, PLC control panel setup, and full operator training. The client went from bare shed to first-block production in under 3 weeks. This factory now produces 8,000+ hollow and solid blocks per shift serving the greater Dhaka construction market.

QT4-15 hydraulic block press with PLC control
Complete civil foundation and factory layout
Hydraulic power unit and electrical wiring
Operator and maintenance training included
8
000+ blocks per shift output achieved